IMPORTANT NOTES: Read First
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
SINGLE POST SWINGS
INSTALLATION INSTRUCTIONS
Rev O
7/31/2019
PC-2181
Page 1 of 11
See Footing Detail
Figure 1.8
Figures 1.1,1.2 & 1.3
Figure 1.7
Figure 1.4
Figure 1.5
Figure 1.6
See Installation Manual
Section PC-131410
Inclusive Swing Seat
AB
See Installation Manual
Sections R5-1847 Tree Top
or R5-1848 Oak Tree Top
(A)
Use liquid thread lock (such as Loctite
®
) with all threaded hardware.
Important:
Liquid thread lock (prior to
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B)
Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be
allowed to cure completely before using the equipment (at least 72 hours).
(C) Important:
Full bucket seat swings should be suspended from structures that are separate from those used
for other swings, or at least suspended from a separated bay of the same structure
.
According to the Handbook
for Public Playground Safety, Publication #325 at www.cpsc.gov.
(D)
Refer to CPSC for appropriate swing spacing.
(E)
Chain length should be adjusted (trimmed) so that the underside of the belt swing is no less than 12"
(Bucket Seat 24") from Finish Grade. See Recommended Swing Seat Heights.
(F)
Important:
Do not modify hanging position of ADA swings. (e.g. shortening chain, etc.)
(G)
All bolt threads protruding beyond the nut must be cut and de-burred until end is smooth to the touch.
Sharp edges and/or points of any kind must be eliminated. A maximum of two threads may be exposed beyond
the end of the nut.
(H)
An appropriate energy absorbing safety surface is required under and around all playground equipment.
Loose fill protective surfacing is shown only as an example for the purpose of this assembly instruction. Other
surfacing material may vary in thickness and/or compression depths. See free publication - The Handbook for
Public Playground Safety, Publication #325 at www.cpsc.gov for the surfacing appropriate for the fall height of
the equipment or consult your surfacing supply representative.
FIGURE 1
Single Post Swings
NOTE
: 3 Bay 8' Height shown. Other
configurations will vary slightly, but
does not affect the assembly.
TREE TOP UPGRADE
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...