www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
1910
Page 2 of 5
Rev F
9/30/2019
TALK TUBE
INSTALLATION INSTRUCTIONS
Approx. ***
48"
1219mm
36"
914mm
**
12"
305mm
Minimum
1 1/4" PVC PIPE
(Not Provided)
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note F)
Elevation View
R5/R35 Ground
(Top of Soil)
(Finish Grade)
46
1
2
"
1181mm
****
10
1
2
"
267mm
****
12"
305mm
Minimum
Elevation View
Revolution Ground
LOOSE FILL SURFACING MATERIAL SHOWN:
9" compressed or 12" uncompressed depth.
Compressed depth shown. (See Note F)
(Top of Soil)
(Finish Grade)
1 1/4" PVC PIPE
(Not Provided)
Step 1
For R5/R35 Versions:
Locate and attach
collars at heights shown in Elevation Views
(more configurations shown on Page 3).
(See Note C)
For Revolution Version:
Refer to Elevation
View, locate mounting holes and remove
required Hole Plugs for assembly.
Step 2
Excavate a trench between proposed Talk
Tube positions at depth shown in Elevation
View.
* Height shown from top of deck to top of collar.
** Height shown from top of collar to top of collar.
*** Height shown from finish grade to top of collar.
**** Height shown from finish grade to mounting hole.
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...