Page 1 of 3
IMPORTANT NOTES: Read First
Footing Layout
Top View
Assembly Views
Elevation
Front View
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
HALF WALL (HANDLE) ASSEMBLY
R5 - 1309
Rev G
(A) Use liquid thread lock (such as Loctite
®
) with all threaded hardware.
Liquid thread lock (prior
to curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving
as a lubricant during assembly.
(B) This Assembly requires additional Assembly Pages. See also Assembly Page R5-09 Collars and R5-11
Socket Clamps.
(C) Collar Locations: The Collar is to be placed 39" from top of the collar to top of the deck.
*Dimension
given is
from Top of
Deck to Top
of Collar.
See Assembly Page
R5-09 Collars and
R5-11 Socket Clamps
See Figure 2
Half Wall to Socket
Clamp Connection
See Figure 1
Half Wall to Deck Connection
Standard Half Wall (Set)
and Square Deck Shown)
DECK
(Top)
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...