IMPORTANT NOTES: Read First
For Customer Service Call
800.333.8519 (U.S.A.) or
541.955.9199 (International)
Manufactured by Krauss Craft, Inc.
www.playcraftsystems.com
DOUBLE SLIDE
1702
Page 1 of 7
Rev E
7/18/2009
(A) Use liquid thread lock (such as Loctite
®
) with all threaded hardware. Important: Liquid thread lock (prior to
curing) helps to eliminate the common problem of "thread seizure" in stainless steel hardware by serving as a
lubricant during assembly.
(B) Do not pour concrete until the equipment is completely assembled, leveled and plumbed. Concrete must be
allowed to cure completely before using the equipment (at least 72 hours).
(C) Refer to Installation Manual Section R5-1305 Double Sit Down Bar and R3.5-1305 Double Sit Down Panel.
(D) Exit height must be between 7" [180mm] and 15" [380mm] from finish grade for slides with an elevation
greater than 48". For slide elevations no greater than 48", the exit height shall be no greater than 11".
Exit region must also have a downward slope of 0 to 4°.
(E) Use appropriate compliant protective surfacing and adjust footing depths accordingly. See free publication -
The Handbook for Public Playground Safety, Publication #325 at www.CPSC.gov for the surfacing appropriate for
the fall height of the equipment or consult you surfacing supply representative.
60" Double Slide
FIGURE 1
NOTE: R5 60" Double Slide shown.
R3.5 may vary slightly, but does not
affect assembly instructions.
R5-1305 Double Sit-Down Bar or
Figure 1.1
See Installation Manual Sections
R3.5-1305 Double Sit Down Panel
Figures 1.3 and 1.4
Figure 1.2
See Footing Detail
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...