www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
SINGLE POST SWINGS
INSTALLATION INSTRUCTIONS
Rev O
7/31/2019
PC-2181
Page 6 of 11
SWING SEAT
SHACKLE BOLT
SHACKLE
CHAIN
Figure 1.5
Figure 1.4
1/2" x 7"
Hex Bolt
2 Plcs
1/2" SAE
Washer
2 Plcs
1/2" Lock Nut
2 Plcs
1/2" SAE
Washer
2 Plcs
POST
SWING BEAM
Figure 1.3
SWING BEAM
1/2" Lock Nut
2 Plcs
1/2" SAE
Washer
2 Plcs
1/2" x 7" Hex Bolt
2 Plcs
1/2" SAE Washer
2 Plcs
ARCH SWING WASHER (R5)
2 Plcs
Step 7
For Belt and Bucket Seats Only
Attach Swing Seat to Chains as shown in Figure 1.5.
(See Notes A & E)
Step 6
For Additional Bay Only
Attach additional Arch Swing Beam to Post
as shown in Figure 1.4. (See Notes A & G)
Step 5
Place Posts into footing holes and attach Arch
Swing Beam to Post as shown in Figure 1.3.
(See Notes A & G)
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...