www.playcraftsystems.com
For Customer Service Call
800.333.8519 (U.S.A.) or 541.955.9199 (International)
GRIP CLIMBER
INSTALLATION INSTRUCTIONS
Rev K
6/15/2021
1216
Page 2 of 5
27"
*
686mm
18"
457mm
24"
610mm
Undisturbed Soil
2b Stone, drain rock
Blocking, See
Installers Manual
Concrete Footing
Optional Filter Fabric Over
Pea Gravel (for drainage)
LOOSE FILL GROUND COVER:
Impact attenuating (resilient) surfacing
9" compacted or 12" uncompressed depth
Compacted depth shown. (See Note D)
(Top of Soil)
(Finish Grade)
(See Table)
X
24"
610mm
12"
305mm
Step 1
Refer to Footing Layout and mark footing hole location.
Dig (1) 12" x 24" x 18" deep oval footing hole. Refer to
Footing Detail for depth and details.
IMPORTANT:
For areas with soft soil conditions, larger
footings may be required.
* Footing depth must be adjusted to compensate for the
depth/thickness requirements of selected safety
surfacing. See Section 06.1 of the Installation Manual.
Footing Detail
Top View - Footing Layout
Footing Distance Table
Center of Post to Center of Footing
Deck Height
x (in)
x (mm)
24"
51-13/16
1315
30"
49-1/4
1251
36"
59-9/16
1513
42"
56-1/16
1424
48"
54-3/16
1376
Summary of Contents for Farm Sound Panel Insert R5
Page 17: ......
Page 31: ......
Page 35: ......
Page 47: ......
Page 48: ......
Page 49: ......
Page 55: ......
Page 59: ......
Page 63: ......
Page 71: ......
Page 75: ......
Page 79: ......
Page 101: ......
Page 113: ......
Page 119: ......
Page 139: ......
Page 143: ......
Page 145: ......
Page 159: ......
Page 171: ......
Page 179: ......
Page 183: ......
Page 184: ......
Page 185: ......
Page 191: ......
Page 197: ......
Page 207: ......
Page 211: ......
Page 217: ......
Page 221: ......
Page 227: ......
Page 235: ......
Page 239: ......
Page 243: ......
Page 263: ......
Page 297: ......
Page 301: ......
Page 314: ...Playground Equipment Maintenance Guidelines Page 13 of 13 NOTES...