Additional Information
• Do not connect or disconnect the DVI-D cable while power is supplied to the Box PC.
• If a Windows operating system is preinstalled:
• the Windows configuration will automatically start
• refer to
Windows Startup First Time
for details
6
Verify the ERR LED is OFF.
The Box PC is ON and if an operating system is installed it will start.
Precautions for Safe Use
Always use the SMART monitoring feature for storage devices that do not comply to the Omron
Storage Device Specifications. Monitor the operating temperature and vibrations to ensure they
stay within the environmental specifications of the storage device.
Additional Information
• The first time initialization will prepare the system and automatically reboot the Box PC when
required.
• Install support software to fully utilize your Box PC and optional connected hardware like the
Industrial Monitor.
5 Installation
5-43
NY-series Industrial Box PC Hardware User's Manual (W553)
5-6 Initial Power ON
5
5-6-1
Initial Power ON Procedure
Summary of Contents for SYSMAC NY Series
Page 4: ...Introduction 2 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 10: ...Index CONTENTS 8 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 32: ...Revision History 30 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 74: ...3 Hardware 3 32 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 114: ...4 Specifications 4 40 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 168: ...5 Installation 5 54 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 198: ...7 Maintenance 7 24 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 254: ...Appendices A 56 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 255: ...I Index I 1 NY series Industrial Box PC Hardware User s Manual W553 I ...
Page 258: ...Index I 4 NY series Industrial Box PC Hardware User s Manual W553 ...
Page 259: ......