22
Installation
Section 2-2
2-2-2
Installation to the Operation Panel
The NT20 can be flush mounted to an operation panel.
Use the panel fittings and tools included in the product package and follow the
procedure below.
!Caution
During work at the panel, take care to ensure that no metal scraps enter the
unit. Otherwise, the product may malfunction.
Note
The thickness of applicable operation panel is 1.6 mm to 4.8 mm. All fittings
must be tightened uniformly to a torque of at least 0.5 to 0.6 N·cm in order to
ensure water- and dust-resistance. The panel must not be soiled or warped,
and must be able to support an installation that will remain secure and strong.
1.
Open a hole, shown below, in the panel and install the NT20 from the front
of the panel.
2.
Attach the panel fittings at four positions, shown below, on the rear of the
NT20.
Fit the hook of the fitting in the square hole in the body and tighten the
screw with a Phillips head screwdriver while lightly pulling the fitting.
Note
In order to ensure adequate water and dustproof performance, tighten the four
panel fittings uniformly and make sure there are no gaps between the fittings
and the NT20 panel.
98.5
178.5
+0.5 mm
0 mm
+0.5 mm
0 mm
Summary of Contents for NT20
Page 1: ...Programmable Terminal Cat No V091 E1 01 NT20 USER S MANUAL ...
Page 2: ...NT series Programmable Terminal User s Manual Produced March 2007 ...
Page 3: ...iv ...
Page 5: ...vi ...
Page 9: ...x TABLE OF CONTENTS ...
Page 15: ...xvi ...
Page 21: ...xxii EC Directives 6 ...
Page 37: ...16 Before Operating Section 1 6 ...
Page 153: ...132 Transferring the Resource Data Section 3 11 ...
Page 185: ...164 Numeral Setting Section 4 8 ...
Page 267: ...246 Key to Programs Section 6 8 ...
Page 281: ...260 Specifications Appendix A ...
Page 285: ...264 Transporting and Storing PTs Appendix C ...
Page 303: ...282 Function Restrictions Depending on the Support Tool Appendix I ...
Page 307: ...286 Index ...
Page 309: ...288 Revision History ...