Starting the Operation
Section 3-7
3-7
Starting the Operation
After completing the screen data transmission and setting the communica-
tions conditions, connect the NT20 to the Host and start operation.
Switching to RUN Mode
Press the Quit touch switch in the System Menu. The start-up screen in the
RUN mode will be displayed.
If the NT20 has failed to start correctly; e.g., the start-up screen is not dis-
played, an error message is displayed, or the screen is not displayed at all,
refer to
7-2 Responding to Displayed Error Messages
and take appropriate
action.
Note
When using Host Link, NT Link, or C200H Direct communications, the screen
displayed on startup is the one specified in the screen switch setting of the PT
status control area.
When using an NT20-ST128, the startup screen is specified with the Support
Tool when creating the screen data. If no startup screen is specified, screen
No.1 becomes the startup screen. If no screen data is registered for the star-
tup screen, the error message “Screen not registered” is displayed. For details
on screen numbers, see
4-3 Screen Display
on page 140.
Confirming the Communications between the NT20 and the PLC/Host
When using the NT20-ST128, use the RS-232C communications check func-
tion in Maintenance Mode to confirm normal communications between the
NT20 and the host. Refer to
Checking the Communications with the Host
(NT20-ST128)
on page 117.
When using the NT20, run the Host program and check that the following
operations are executed normally.
• Confirm that the NT20 screens switch according to the Host program exe-
cution.
If the screens do not switch correctly, check the connection between the
NT20 and the Host and also check the settings.
Refer to
SECTION 2 Hardware Settings and Connections
.
• Confirm that the information selected by the NT20 touch switches has
been correctly sent to the PLC by displaying the information of bits and
words by using a Programming Device (e.g., CX-Programmer). If the
information sent from the NT20 has not been correctly received by the
PLC, check the screen data settings (specifically the switch settings).
For details on the screen data creation, refer to the
NT Support Tool for
Windows Operation Manual
(Cat. No. V061).
Summary of Contents for NT20
Page 1: ...Programmable Terminal Cat No V091 E1 01 NT20 USER S MANUAL ...
Page 2: ...NT series Programmable Terminal User s Manual Produced March 2007 ...
Page 3: ...iv ...
Page 5: ...vi ...
Page 9: ...x TABLE OF CONTENTS ...
Page 15: ...xvi ...
Page 21: ...xxii EC Directives 6 ...
Page 37: ...16 Before Operating Section 1 6 ...
Page 153: ...132 Transferring the Resource Data Section 3 11 ...
Page 185: ...164 Numeral Setting Section 4 8 ...
Page 267: ...246 Key to Programs Section 6 8 ...
Page 281: ...260 Specifications Appendix A ...
Page 285: ...264 Transporting and Storing PTs Appendix C ...
Page 303: ...282 Function Restrictions Depending on the Support Tool Appendix I ...
Page 307: ...286 Index ...
Page 309: ...288 Revision History ...