– 387 –
NWA-008841-001 Rev.5.0
90ch3003.fm
The figure in the SWITCH NAME column and the position of
in the SETTING POSITION col-
umn indicate the standard setting of the switch. When the switch is not set as shown by the figure and
, the setting of the switch varies with the system concerned.
NOTE:
When the power is on, flip MB switch to ON (UP position) before plugging/unplugging the cir-
cuit card.
SW3 (Dip SW)
1
Set the equalizer according to the cable
length between the system and the
CSU.
OFF
2
OFF
3
OFF
4
ON
When mounting this card on Remote
Site.
OFF
When mounting this card on Main Site.
SWITCH
NAME
SWITCH
NUMBER
SETTING
POSITION
FUNCTION
CHECK
1 2 3 4
ON
ON
SW
3-1
SW
3-2
SW
3-3
CABLE
LENGTH
ON
ON
ON
0 - 40 m
(0-131.2 ft.)
ON
ON
OFF 40 - 80 m
(131.2-262.5 ft.)
ON
OFF
ON
80 - 120 m
(262.5-394 ft.)
ON
OFF OFF 120 - 160 m
(394-525 ft.)
OFF
ON
ON
160 - 200 m
(525-656 ft.)
OFF OFF OFF Signal is not sent
ON
ON
PN-DAIC (DAIC)