![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421077.webp)
– 61 –
NWA-008841-001 Rev.5.0
90ch2001.fm
CHAPTER 2
INSTALLATION
This chapter explains how to install the PBX and the peripheral equipment,
system initialization and data entry, and operation test procedures you should
follow after completing the installation.
PRECAUTIONS .........................................................................
62
PROCEDURE ............................................................................
72
UNPACKING ..............................................................................
75
WIRING POWER CABLE TO TERMINALS ..............................
76
INSTALLATION OF MAIN EQUIPMENT ..................................
82
POWER CABLE CONNECTION ............................................... 111
SUPPLY VOLTAGE CHECK AND HEAT RUN TEST .............. 121
BATTERY CONNECTION ......................................................... 129
CABLE RUNNING TO MDF ...................................................... 137
TERMINATION OF CABLES ON MDF ..................................... 144
INSTALLATION OF PERIPHERAL EQUIPMENT .................... 173
MOUNTING CIRCUIT CARDS .................................................. 275
SYSTEM INITIALIZATION ......................................................... 277
SYSTEM DATA ENTRY ............................................................ 278
OPERATION TEST .................................................................... 280
SYSTEM DATA SAVE ............................................................... 281
CLEANING AND VISUAL CHECK ............................................ 281
MOUNTING FRONT COVER ..................................................... 282
BACKUP CPU SYSTEM ............................................................ 283
CHAPTER 2 INSTALLATION