CHAPTER 2 INSTALLATION
– 100 –
NWA-008841-001 Rev.5.0
90ch2001.fm
Wall Mounting Installation
• Check the site for installing the PBX with the work drawing to verify that the
required floor space is ensured and that service entrances and ducts for trunk/
extension cables, power cables and grounding conductors have been properly
worked at correct positions. See
“Floor Space”
and
“Cable Hole Location”
.
Page 84
,
Page 85
• Detach the front cover of each Module. See
“Detaching FRONT
COVER”
.
Page 88
• Mark hole positions for installation of the PBX main equipment. See
“Wall
Marking for HANGER ASSEM”
.
Page 101
• Secure the HANGER ASSEM to the wall.
• Hang the PIM to the HANGER ASSEM. See
“Hanging PIM to HANGER AS-
SEM”
.
Page 102
NOTE:
The BATTM cannot be installed on the wall.
• After hanging each PIM to the respective HANGER ASSEMs, connect PIMs
using screws. See
“Connection of Modules”
.
Page 94
• Carefully review every step above to check that all necessary screws have been
properly placed and tightened.
Start
Checkup
before installation
Marking
Installation of Module
Multiple-Module
Checking
Detaching
Front Cover
End
Configuration
INSTALLATION OF MAIN EQUIPMENT