19-inch Rack Mounting Installation
• Check the site for installing the PBX with the work drawing to verify that the
required floor space is ensured and that service entrances and ducts for trunk/
extension cables, power cables and grounding conductors have been properly
worked at correct positions. See
“Floor Space”
and
“Cable Hole Location”
.
Page 84
,
Page 85
• Detach the SIDE COVER and SIDE PANEL of the Module for 19
″
RACK
BRACKET (A) mounting. For 19
″
RACK BRACKET (B), this procedure is not
required. See
“Detaching SIDE COVER/SIDE PANEL”
.
Page 104
• Mount the 19
″
RACK BRACKET (A) to the PIM. See
“Connection of
19
″
RACK BRACKET (A)”
.
Page 106
• Mount the PIM with the 19
″
RACK BRACKET (A) to the 19-inch RACK. See
“Mounting PIM to 19-inch RACK”
.
Page 107
• Mount the 19
″
RACK BRACKET (B) to the bottom-stack Module. See
“Con-
nection of 19
″
RACK BRACKET (B)”
.
Page 108
• Mount the 19
″
RACK BRACKET (A) to the top-stack PIM. See
“Connection
of 19
″
RACK BRACKET (A)”
.
Page 106
• Mount the modules with the 19
″
RACK BRACKET (A) and (B) to the 19-inch
RACK. See
“Mounting Multiple-Module to 19-inch RACK”
.
Page 109
NOTE:
The BATTM cannot be installed in the 19-inch RACK.
• Carefully review every step above to check that all necessary screws have been
properly placed and tightened.
Start
Checkup
before installation
One PIM
Multiple-Module
Checking
Detaching
Side Cover/Side Panel
End
Configuration
Configuration
JULY/1/2006
INSTALLATION OF MAIN EQUIPMENT