![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421108.webp)
CHAPTER 2 INSTALLATION
– 92 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Connection of Module and BASE for Fixed/Stationary Equipment
(1) Mount the Module on the BASE by placing it over the hooks.
(2) Slide the Module into the inner end.
NOTE:
Pay attention to do not put the Module on Edging of the cable hole on BASE.
(3) Secure the Module to the BASE with three screws.
NOTE:
Screws are attached to the Module.
Connection of Module and BASE
SCREWS
BASE
MODULE
BASE
HOOKS
SLIDE MODULE INTO
INNER END.
INSTALLATION OF MAIN EQUIPMENT