![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421095.webp)
CHAPTER 2 INSTALLATION
– 79 –
NWA-008841-001 Rev.5.0
90ch2001.fm
(4) When the system is two-frame configuration, the Installation cable of the right side frame can go
through the BASE of the left side frame.
Installation Cable Wiring for Two-Frame Configuration when AC120 V/ 240 V Power Supply System
BASE
FG
LINE
NEUTRAL
FG
LINE
NEUTRAL
TERMINAL
BLOCKS
TO
AC POWER
DISTRIBUTION
BOARD
INSTALLATION CABLE
CORD BUSH
WIRING POWER CABLE TO TERMINALS