– 260 –
NWA-008841-001 Rev.5.0
90ch2002.fm
(2) Installation of PZ-8PFTB
STEP1:
Mount the PZ-8PFTB card into the PFT slot of the PIM.
STEP2:
Connect the champ connectors of 25-pair cables to the PFT0 and PFT1 connectors on the PZ-
8PFTB card as shown below.
Connection of 25-Pair Cable and PZ-8PFTB
Continued on next page
PFT1 CONNECTOR
CHAMP CONNECTOR ATTACHED TO PZ-8PFTB
25-PAIR CABLE
To MDF
PFT0 CONNECTOR
PZ-8PFTB
Power Failure Transfer (PFT)