![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421102.webp)
CHAPTER 2 INSTALLATION
– 86 –
NWA-008841-001 Rev.5.0
90ch2001.fm
Floor Marking for BASE PLATE
(for Fixed Equipment)
Floor Marking for BASE TRAY
(for Stationary Equipment)
(WALL)
UNIT : mm (inch)
Outline of
Module
ANCHOR BOLT
×
4
347.2 (13.7)
407.2 (16.0)
412.4 (16.0)
30
(1.2)
30
(1.2)
8.8
(0.3)
8.8
(0.3)
34
(1.3)
20.4
(0.8)
3.2
(0.2)
128
(5.6)
202.6
(7.9)
40.6
(1.6)
Using MOUNTING BRACKET
: 10 (0.4)
Not Using MOUNTING BRACKET : 1.7 (0.1)
ANCHOR BOLT
×
4
45
128
(1.8)
(5.0)
43.9
(1.7)
347.2
(13.7)
UNIT : mm (inch)
INSTALLATION OF MAIN EQUIPMENT