CHAPTER 2 INSTALLATION
– 97 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Installation of I/F BRACKET
Install the I/F BRACKET to the top-stack PIMs when the equipment is two frame stacks.
Secure the I/F BRACKET to rear side of top-stack PIMs with two screws from inside of PIMs.
NOTE:
Screws are attached to the I/F BRACKET.
SCREW
FRONT SIDE
SCREW
I/F BRACKET
INSTALLATION OF MAIN EQUIPMENT