![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421124.webp)
CHAPTER 2 INSTALLATION
– 108 –
NWA-008841-001 Rev.5.0
90ch2001.fm
• Connection of 19
″
RACK BRACKET (B)
(1) Place the BASE PLATE on the 19
″
RACK BRACKET (B).
(2) Secure the BASE PLATE with four washer and nuts.
(3) Mount the BASE to the BASE PLATE.
(See
“Connection of BASE and BASE PLATE”
.
Page 91
)
(4) Mount the Module to the BASE.
(See
“Connection of Module and BASE”
.
Page 92
)
NOTE:
Nuts and washers are attached to the 19
″
RACK BRACKET (B).
Connection of 19
″
RACK BRACKET (B)
NUT
WASHER
19
″
RACK BRACKET (B)
BASE PLATE
INSTALLATION OF MAIN EQUIPMENT