![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421093.webp)
CHAPTER 2 INSTALLATION
– 77 –
NWA-008841-001 Rev.5.0
90ch2001.fm
(4) When the system is two-frame configuration, the AC CORD-D of the right side frame can go
through the BASE of the left side frame.
AC CORD Wiring for Two-Frame Configuration when AC120 V/240 V Power Supply System
BASE
FG
LINE
NEUTRAL
FG
LINE
NEUTRAL
TERMINAL
BLOCKS
TO
120 V/240 V AC
POWER SOURCE
AC CORD-D
CORD BUSH
WIRING POWER CABLE TO TERMINALS