![background image](http://html.mh-extra.com/html/nec/univerge-neax-2000-ips/univerge-neax-2000-ips_installation-manual_251421092.webp)
CHAPTER 2 INSTALLATION
– 76 –
NWA-008841-001 Rev.5.0
90ch2001.fm
WIRING POWER CABLE TO TERMINALS
AC120 V/240 V Power Supply System
There are two kinds of Power cable : AC CORD-D for Stationary Equipment (For North America, Latin
America, Australia)/Fixed Equipment 2 (For Asia, Africa, Europe,
Middle East)
: Installation Cable for Fixed Equipment 1 (For North America, Latin
America, Australia)
• Using AC CORD-D
(1) Take the AC CORD-D out of the hole on the left side of the BASE, then secure the code to the
BASE with the cord bush.
NOTE:
Cord bush is attached to the AC CORD-D.
(2) Wire the AC CORD-D and the FG cable to the FG, NEUTRAL, LINE and Ground terminals on the BASE.
(3) Wire the AC CORD-B to the FG, NEUTRAL and LINE terminals on the BASE.
Wiring AC CORD to Terminals when AC120 V/240 V Power Supply System
NOTE 1:
For grounding requirements, refer to
“PRECAUTIONS”
.
Page 62
NOTE 2:
Cable colors in the parentheses are for Australia and Europe.
Continued on next page
FG CABLE
(GREEN)
HOW TO SECURE CABLES TO TERMINAL BLOCK
INSERT A SCREW DRIVER INTO THE INSIDE HOLE OF TERMINAL BLOCK.
PULL DOWN THE SCREW DRIVER TOWARD INSIDE AND OPEN THE METAL PLATE.
INSERT A POWER CABLE INTO THE OUTSIDE HOLE OF TERMINAL BLOCK.
REMOVE THE SCREW DRIVER.
1
1
2
2
3
3
4
4
AC CORD-B
AC CORD-D (3.5 m)
TO
120 V/240 V
AC POWER
SOURCE
TO CN1 on
PZ-PW121/PZ-PW126 in PIM
FG
NEUTRAL
LINE
TERMINAL
BLOCKS
GREEN
(GREEN/YELLOW)
BLACK (BROWN)
BLACK (BROWN)
WHITE (BLUE)
GREEN
(GREEN/YELLOW)
WHITE (BLUE)
BASE
FRONT
JULY/15/2007
WIRING POWER CABLE TO TERMINALS