
Sheeter SVC 525C
89
Set-up, commissioning
Introduction
WARNING!
Insufficient properties and condition of the underfloor.
Non-observance could result in serious injury or death.
Check the properties and condition and load rating of the subsurface in
the set-up location.
For necessary minimum requirements, please see the "Technical data"
chapter.
CAUTION!
Incorrect supply voltage.
Non-observance could result in severe property damage.
•
If the existing rated voltage deviates from the details on the name
plate, wiring diagram, and "technical data" in the operating manual,
an isolating transformer must be used.
•
You can get the necessary information from the manufacturer.
CAUTION!
Tripping points due to connecting cables lying around.
Non-observance could result in minor or moderate injury.
Lay the machine connections (cables, hoses, pipes) so that there are
no tripping points.
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...