
Sheeter SVC 525C
87
Set-up, commissioning
Introduction
7
Set-up, commissioning
7.1
Introduction
To set up/commission the machine, also follow:
• The safety instructions.
See chapter “7.1.2 Safety instructions”.
• The protective devices.
See chapter “4.5.8 Checking protective devices”.
• The intended use.
See chapter “2.1 Intended use”.
• Qualifications of the service personnel.
See chapter “7.1.1 Qualification of personnel”.
7.1.1
Qualification of personnel
This table lists the necessary qualification of the personnel related to "Set-
up and commissioning" of the machine.
:
Spe
c
ially
t
ra
ine
d
per
s
onn
el
Inst
ruc
te
d
oper
a
ting
pe
rso
nnel
Inst
ruc
te
d
pers
onne
l wit
h
spe
c
ialize
d
tr
a
ining
(m
echa
n
ica
l/ elect
rica
l en
gineer
in
g)
Set-up
-
-
X
Electrical connec-
tions
-
-
X
Stationary mains
connection
-
-
X
Commissioning
-
-
X
Table 25: Qualification of personnel; Set-up, commissioning
Legend: X permitted, - not permitted
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...