Sheeter SVC 525C
139
Maintenance
Operational maintenance
9.3.1.2
Checking the protective hood and guard door
For technical safety reasons, the function of the protective hood and the
guard door must be checked daily.
Checking the
protective hood
Proceed as follows to check the protective hood.
These prerequisites must be fulfilled:
• The machine is ready for operation.
Here's how to check the protective hood:
1) Start the machine.
2) Raise the protective hood slightly on the handle.
The protective hood can only be opened up to the locking position.
The machine stops and the guard locking is released after a short delay.
3) Then fully open the protective hood.
4) Press the <Start> button.
The machine may not start up.
5) Close the protective hood again.
The protective hood is checked.
Checking the
guard door
Proceed as follows to check the guard door.
These prerequisites must be fulfilled:
• The machine is ready for operation.
• The guard door is checked.
How to check the guard door:
1) Start the machine.
2) Try opening the guard door.
The guard door is not permitted to be opened due to the guard locking.
3) Open the protective hood.
See the Checking the protective hood section for the procedure.
4) Then open the guard door.
It should now be possible to open the guard door.
5) Close the guard door.
6) Close the protective hood.
The guard door is checked.
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...