
Sheeter SVC 525C
161
Maintenance
Maintenance schedule
9.5
Maintenance schedule
Incorrect maintenance intervals during multi-shift operation.
Non-observance could result in property damage.
All specified maintenance intervals are designed for single-shift opera-
tion. For multi-shift operation, calculate the specified intervals accord-
ingly.
Chap-
ter No.:
Step
Interval
Date
Signature
Operational
maintenance
7.6
“Inspection after initial
operation”
After 20 oper-
ating hours
9.3.1
“Checking protective
devices”
Daily
9.3.2
“Cleaning of the machine”
Weekly
9.3.3
“Cleaning the optical sen-
sors”
Daily
9.3.4
“Cleaning/replacing the fil-
ter of the vacuum pump
VT 4.25”
Weekly
Maintenance
9.4.1
“Checking the pneumatic
lines”
Monthly
9.4.2
“Checking the guide shaft
bearings”
Monthly
9.4.3
“Changing the knives of
the longitudinal cutting
unit”
In case of
wear
9.4.4
“Changing the knives of
the cutting cylinder unit”
In case of
wear
9.4.5
“Changing the plastic ring”
In case of
wear
9.4.6
“Changing the nylon mat”
In case of
wear
9.4.7
“Checking the vacuum
pump VT 4.25”
Every 3000
operating
hours
9.4.8
“Checking the fan in the
control cabinet”
Monthly
Table 30: Maintenance schedule
MBO recommends attaching a copy of this maintenance schedule to the
machine.
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...