
Sheeter SVC 525C
31
Basic safety instructions
Personal protective equipment
2.10
Personal protective equipment
2.10.1
Operation and adjustment
This personal protective equipment must be provided and worn for the op-
eration and set-up of the machine:
• Ear protection
• Cut-resistant safety gloves
• Safety shoes
2.10.2
Operational maintenance (cleaning)
This personal protective equipment must be provided and worn for the
proper maintenance (cleaning) of the machine:
• Safety shoes
• Cut-resistant safety gloves
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...