
140
Sheeter SVC 525C
Maintenance
Operational maintenance
9.3.1.3
Check that all protective devices are present
Proceed as follows to check the protective devices.
Prerequisites
These prerequisites must be fulfilled:
• The machine is ready for operation.
Checking protective
devices
Here's how to check the protective devices:
Check all covers and protective devices to make sure they are present
and functional.
See chapter “4.5.8 Checking protective devices”.
The protective devices are checked.
Operation without protective devices.
Non-observance could result in serious injury or death.
The protective devices protect against danger spots.
•
Operation of the machine without protective devices is forbidden.
•
Make sure that all protective devices are re-attached after maintenance
or maintenance work.
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...