
Sheeter SVC 525C
81
Transport, interim storage
Introduction
6
Transport, interim storage
6.1
Introduction
To transport and store the machine temporarily, heed also:
• The safety instructions.
See chapter “6.1.2 Safety instructions”.
• The protective devices.
See chapter “4.5.8 Checking protective devices”.
• Qualification of transport personnel.
See chapter “6.1.1 Qualification of personnel”.
6.1.1
Qualification of personnel
This table lists the necessary qualification of the personnel related to
"Transport and interim storage" of the machine.
6.1.2
Safety instructions
Spe
c
ially
t
ra
ine
d
per
s
onn
el
Inst
ruc
te
d
o
p
er
ating
pe
rso
nnel
Inst
ruc
te
d
p
e
rs
onne
l wit
h
spe
c
ialize
d
tr
a
ining
(m
e
c
ha
nica
l/ elect
rica
l en
gin
eer
in
g)
Transportation
X
-
-
Interim storage
X
-
-
Table 24: Qualification of personnel; Transport, interim storage
Legend: X permitted, - not permitted
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...