
Sheeter SVC 525C
145
Maintenance
Maintenance
9.4
Maintenance
9.4.1
Checking the pneumatic lines
Here's how to check the pneumatic lines:
1) Check all pneumatic lines monthly for damage (visual inspection).
2) It is not permitted to operate machines with damaged pneumatic lines.
3) Damaged pneumatic lines must be replaced immediately by trained and
authorized personnel.
The pneumatic lines are checked.
WARNING!
Machine parts are under compressed air.
Non-observance could result in serious injury or death.
Before maintenance work, ensure that:
•
The compressed air supply is switched off.
•
The system is fully vented.
WARNING!
Defective pneumatic lines.
Non-observance could result in serious injury or death.
Check the pneumatic lines monthly for damage.
Compressed air generation costs money!
For this reason, please report every leak to the person responsible for
the plant.
Summary of Contents for SVC 525C
Page 1: ...Sheeter Translation of the original operating manual Keep for future reference SVC525C ...
Page 48: ...44 Sheeter SVC 525C Product description Technical data ...
Page 66: ...62 Sheeter SVC 525C Structure and function Protective devices ...
Page 90: ...86 Sheeter SVC 525C Transport interim storage Interim storage of the machine ...