Use in the field
109
GEOCONTROL headland function
Begin with creating the field boundary where you spread down to
the border along the field boundary while driving to the left with the
border spreading plate and the correct dosage switched off.
Fill the field with injections on your sprayer tramline defined
previously.
The GEOCONTROL will interrupt and start the process at the correct
time while turning on the headland.
Without GEOCONTROL
Drive as closely as possible to the end of the property and stop
spreading by closing the dosing units before you turn.
Let the spreading discs turns and do not switch off the PTO shaft.
Open the dosing units again when you are a full working width
down from the end of the land.
Finally spread the field edges with the border spreading plate.
See paragraph »Border spreading« on page 111.
Summary of Contents for Exacta-TL-GEOSPREAD GS3
Page 6: ...Preface 6 ...
Page 166: ...Notes 166 Notes ...