1.
Move the shipping box to a staging area as close to the installation site as possible. While the
chassis is bolted to the pallet, you can use a forklift or pallet jack to move it. Make sure there is
enough space to remove components from the chassis.
2.
Position the shipping box with the arrows pointing up.
3.
Using the box cutter, slice the nylon straps that hold the shipping boxes to the pallet.
4.
Lift the shipping box off the chassis.
5.
Remove the cardboard accessory box.
6.
Remove the foam padding from the top of the box.
7.
Remove the plastic cover from the switch chassis.
8.
Use a 13/32 in. (10 mm) open-end or socket wrench to remove the four sets of bracket bolts that
secure the chassis to the shipping pallet (see
Figure 72: Bracket Bolt Removal
9.
Unpack the accessory box and lay out the contents so that they are ready for use.
196
Summary of Contents for QFX10016
Page 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Page 10: ...Compliance Statements for Environmental Requirements 428 x...
Page 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Page 16: ...Figure 1 QFX10016 Front and Rear 5...
Page 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Page 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Page 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Page 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Page 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...