NOTE: Use the following procedure to power off a QFX10000.
Ensure that you have the following parts and tools available to power off the switch:
• An ESD grounding strap
• An external management device such as a PC
• An RJ-45 to DB-9 rollover cable to connect the external management device to the console port on
one of the Routing and Control Board (RCBs)
To power off a QFX10000:
1. Connect to the switch using one of the following methods:
• Connect a management device to the console (CON) port on a RCB by following the instructions
in
Connect a Device to a Management Console Using an RJ-45 Connector
.
• Connect a management device to one of the two management (MGMT) ports on the RCB by
following the instructions in
Connect a Device to a Network for Out-of-Band Management
.
2. Shut down Junos OS from the external management device by issuing the
request system halt
operational mode CLI command. This command shuts down the switch gracefully and preserves
system state information. A message appears on the console, confirming that the operating system
has halted.
You see the following output (or something similar, depending on the hardware being shut down)
after entering the command:
Shutdown NOW!
System going down IMMEDIATELY
Terminated
Poweroff for hypervisor to respawn
Oct 25 10:35:05 init: event-processing (PID 1114) exited with status=1
Oct 25 10:35:05 init: packet-forwarding-engine (PID 1424) exited with status=8
.
Waiting (max 60 seconds) for system process `vnlru_mem' to stop...done
Waiting (max 60 seconds) for system process `vnlru' to stop...done
Waiting (max 60 seconds) for system process `bufdaemon' to stop...done
Waiting (max 60 seconds) for system process `syncer' to stop...
Syncing disks, vnodes remaining...0 0 0 0 done
350
Summary of Contents for QFX10016
Page 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Page 10: ...Compliance Statements for Environmental Requirements 428 x...
Page 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Page 16: ...Figure 1 QFX10016 Front and Rear 5...
Page 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Page 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Page 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Page 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Page 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...