To install a SIB:
1. Place an electrostatic bag or an antistatic mat on a flat, stable surface.
2. Attach the ESD grounding strap to your bare wrist, and connect the strap to the ESD point on the
chassis. There is an ESD point located next to the protective earthing terminal and below PSU 5 on
the QFX10008 rear panel (see
) and below PSU_9 on the QFX10016 rear
panel (see
).
Figure 169: ESD Point on QFX10008 Chassis Rear
1
—
ESD point
Figure 170: ESD Point on QFX10016 Chassis Rear
3. Remove the appropriate fan tray (see
Removing a QFX10008 Fan Tray
).
321
Summary of Contents for QFX10016
Page 1: ...QFX10016 Switch Hardware Guide Published 2022 09 09...
Page 10: ...Compliance Statements for Environmental Requirements 428 x...
Page 15: ...Figure 1 on page 5 shows a front and rear view of the QFX10016 4...
Page 16: ...Figure 1 QFX10016 Front and Rear 5...
Page 239: ...RELATED DOCUMENTATION QFX10008 Installation Overview QFX10002 System Overview 228...
Page 270: ...1 ESD point Figure 113 ESD Point on QFX10016 Chassis Rear 1 ESD point 259...
Page 287: ...Figure 130 Installing a JNP10K PWR AC2 in a QFX10016 276...
Page 322: ...Figure 159 Installing a JNP10K PWR DC2 in QFX10016 311...
Page 366: ...5 CHAPTER Troubleshooting Troubleshooting QFX10000 Modular Chassis 356...