Maintenance
XHD Installation, Operation, and Maintenance Manual
121
2. Insert the casing volute liner retention studs into the casing volute liner (561) using a metric
stud driver.
Figure 116: Volute liner stud installation
3. Coat the seal cover-to-volute liner gasket (351Q) with lubricant and install into the casing
volute liner (561).
4. Support the casing volute liner (561) using the proper end of the Goulds-provided impeller/
casing volute hook tool.
5. Lift the liner into position and insert into the gland half casing (100D) using the installed
retention studs (353K) as a guide.
Figure 117: Volute liner installation
6. Secure the casing volute liner (561) to the gland half casing (100D) by installing and fully
tightening the volute liner retention hex nuts (355C).
Install the impeller - Metal-Lined
Two (2) people should work together to install the impeller for safety purposes.
1. Loosen the adjustment plate bolts (352G) and nuts (427D) but DO NOT remove bolts or
adjustment plates (234F). Bolts should remain finger-tightened to keep rotating assembly
constrained to the pedestal.
2. Slide the power end forward towards the suction side of the pump to allow better access to
the shaft (122) impeller threads.
3. Apply anti-seize compound to the shaft (122) impeller threads.
4. Lift the impeller (101) using a Goulds-provided impeller hook or a chain/sling threaded
through a vane passage attached to the hoist.
Summary of Contents for Goulds Pumps XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......
Page 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Page 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Page 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...