Maintenance
XHD Installation, Operation, and Maintenance Manual
128
6. Install the flat washers (553) and casing bolt hex nuts (600C) onto the casing bolts (600A)
to complete assembly of the casing halves.
Figure 126: Installation of suction half casing with attached components - rubber lined
Install packing, lantern ring, and gland
1. Measure the appropriate length of packing (106) strips by wrapping packing around the
shaft sleeve (126) to estimate the desired length. Carefully cut each strip that is needed ¼”
shorter than circumference of the shaft sleeve.
2. Install packing (106) and lantern ring (105) in the appropriate order that based upon the
service dilution requirements. See the Maintenance – Packing section for details.
3. Position the two halves of the gland assembly (107) around the shaft sleeve (126).
Assemble the gland assembly (107) and attach to the stuffing box using the gland adjusting
bolts (353).
Install the flanges and joint gaskets
1. Install the two-piece suction and discharge flanges (195C, sizes 150 and above only).
2. Install the discharge joint flat gasket (351A).
3. Install the suction joint flat gasket (351B).
Summary of Contents for Goulds Pumps XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......
Page 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Page 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Page 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...