Maintenance
XHD Installation, Operation, and Maintenance Manual
95
2. Remove the casing volute liner retention nuts (600L) from the volute liner retention studs
(600L) at the back of the gland half casing (100D).
3. Move the casing volute liner (600T) out of and away from the gland half casing.
Figure 79: Rubber gland liner removal
Summary of Contents for Goulds Pumps XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......
Page 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Page 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Page 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...