Maintenance
XHD Installation, Operation, and Maintenance Manual
103
6. Remove the bearing frame adjustment plate bolts (352G), nuts (427D) and bearing frame
adjustment plates (234F).
Figure 91: Removal of bearing frame hardware
7. Tension the hoist fully to lift and move the power end to designated work area.
Figure 92: Lifting of power end
Disassemble the power end - XHD, oil lubrication
1. Remove the outboard bearing cover assembly hex head capscrews (370N).
2. Remove the outboard bearing cover (109) from the bearing cartridge housing (228) with the
o-ring (412) and labyrinth seal (332A) still installed.
3. Remove the outboard labyrinth seal (332A) and o-ring (412).
4. Remove the Bellville preload washer (529).
Important: Always remove the outboard bearing cover assembly and Bellville washer first.
This will remove the preload from the rotating element assembly for easier removal of the
remaining bearing frame components.
Summary of Contents for Goulds Pumps XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......
Page 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Page 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Page 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...