Maintenance
XHD Installation, Operation, and Maintenance Manual
99
3. Carefully remove the assembly and hoist to the ground to disassemble as required, using
the instructions in the related sections of this instruction manual.
Figure 84: Removal of gland half casing
Figure 85: Gland half casing disassembly
Locate and lift the volute liner for optional discharge locations (field
replacement) - Rubber-Lined
1. The Volute Liner (600T) can be installed into the Gland Casing (100D) the field in any of the
optional discharge orientations.
2. Remove the Suction casing and Suction Liner assembly as described in the section
'Remove the Suction Side.
Summary of Contents for Goulds Pumps XHD
Page 1: ...Installation Operation and Maintenance Manual XHD ...
Page 2: ......
Page 151: ...Parts Listings and Cross Sectionals XHD Installation Operation and Maintenance Manual 149 ...
Page 153: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 151 ...
Page 156: ...Certification CE or CE ATEX XHD Installation Operation and Maintenance Manual 154 ...