Integration Time
Integration time is the period during which the multimeter’s analog-to-
digital (A/D) converter samples the input signal for a measurement.
Integration time affects the measurement resolution (for better resolution,
use a longer integration time), and measurement speed (for faster
measurements, use a shorter integration time).
Applies to all measurement functions except ac voltage, ac current,
frequency, and period. The integration time for the math operations
(null, min-max, dB, dBm, limit test) is the same as the integration time
for the measurement function in use.
•
Integration time is specified in
number of power line cycles
(
NPLC
s).
The choices are 0.02, 0.2, 1,
10
, or 100 power line cycles.
The default
is 10 PLCs.
•
The integration time is stored in
volatile
memory; the multimeter
selects 10 PLCs when power has been off or after a remote
interface reset.
•
Only the integral number of power line cycles (1, 10, or 100
PLC
s)
provide normal mode (line frequency noise) rejection.
•
The only way to control the reading rate for ac measurements is by
setting a trigger delay (
see page 79
).
•
The following table shows the relationship between integration time
and measurement resolution.
Integration Time
0.02 NPLC
0.2 NPLC
1 NPLC
10 NPLC
100 NPLC
Resolution
0.0001 x Full-Scale
0.00001 x Full-Scale
0.000003 x Full-Scale
0.000001 x Full-Scale
0.0000003 x Full-Scale
3
Chapter 3 Features and Functions
Measurement Configuration
57
Summary of Contents for 34401A
Page 12: ...1 Quick Start 1 ...
Page 26: ...2 Front Panel Menu Operation 2 ...
Page 50: ...3 Features and Functions 3 ...
Page 103: ...4 Remote Interface Reference 4 ...
Page 135: ...SCPI Status System 4 Chapter 4 Remote Interface Reference The SCPI Status Model 135 ...
Page 170: ...5 Error Messages 5 ...
Page 182: ...6 Application Programs 6 ...
Page 196: ...7 Measurement Tutorial 7 ...
Page 214: ...8 Specifications 8 ...