To Prepare the Multimeter for Use
The following steps help you verify that the multimeter is ready for use.
1 Check the list of supplied items.
Verify that you have received the following items with your multimeter.
If anything is missing, contact your nearest Hewlett-Packard Sales Office.
One test lead kit.
One power cord.
This
User’s Guide
.
One
Service Guide
.
One folded
Quick Reference
card.
Certificate of Calibration.
2 Connect the power cord and turn on the multimeter.
The front-panel display will light up while the multimeter performs its
power-on self-test. The
HP-IB
bus address is displayed. Notice that the
multimeter powers up in the
dc voltage
function with autoranging enabled.
To review the power-on display with all annunciators turned on,
hold down
Shift
as you turn on the multimeter.
3 Perform a
complete
self-test.
The
complete
self-test performs a more extensive series of tests than
those performed at power-on. Hold down
Shift
as you press the
Power switch to turn on the multimeter;
hold down the key for more
than 5 seconds
. The self-test will begin when you release the key.
If the self-test is successful, “
PASS
” is displayed. If the self-test is
not successful, “
FAIL
” is displayed and the
ERROR
annunciator turns
on. See the
Service Guide
for instructions on returning the multimeter
to Hewlett-Packard for service.
1
Chapter 1 Quick Start
To Prepare the Multimeter for Use
13
Summary of Contents for 34401A
Page 12: ...1 Quick Start 1 ...
Page 26: ...2 Front Panel Menu Operation 2 ...
Page 50: ...3 Features and Functions 3 ...
Page 103: ...4 Remote Interface Reference 4 ...
Page 135: ...SCPI Status System 4 Chapter 4 Remote Interface Reference The SCPI Status Model 135 ...
Page 170: ...5 Error Messages 5 ...
Page 182: ...6 Application Programs 6 ...
Page 196: ...7 Measurement Tutorial 7 ...
Page 214: ...8 Specifications 8 ...