Section 3 • Scheduled Maintenance Procedures
B-10
Test the Ground Control
Override
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
A properly functioning ground control override is
essential to safe machine operation. The ground
control override function is intended to allow ground
personnel to operate the machine from the ground
controls whether or not the Emergency Stop button
on the platform controls is in the on or off position.
This function is particularly useful if the operator at
the platform controls cannot return the boom to the
stowed position.
1 Push in the platform red Emergency Stop button
to the off
position.
2 Start the engine from the ground controls.
3 At the ground controls, operate each boom
function through a partial cycle.
Result: All boom functions should operate.
B-11
Check the Oscillate Directional
Valve Linkage
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Note: Perform this test only on models equipped
with a oscillating axle.
Proper axle oscillation is essential to safe machine
operation. If the oscillate directional valve linkage is
not operating correctly, the stability of the machine
is compromised and it may tip over.
1 Remove the drive chassis cover from the
non-steer end of the machine.
2 Locate the oscillate directional valve inside of
the non-steer axle and inspect the linkage for
the following:
• Lock nut is tight against yoke
• Yoke clevis pins are installed
• Cotter pins are installed through clevis pins
• Linkage is properly attached to
directional valve
CHECKLIST
B
PROCEDURES
Summary of Contents for S-60 HC
Page 1: ......
Page 215: ...Section 6 Schematics December2013 6 7 Ford DSG 423 Engine Wire Harness 6 8 ...
Page 218: ...December2013 Section 6 Schematics 6 10 Ford MSG 425 Engine Wire Harness 6 9 ...
Page 219: ...Section 6 Schematics December2013 6 11 Electrical Schematic Options All Models 6 12 ...
Page 222: ...December2013 Section 6 Schematics 6 14 Wiring Diagram Belt Driven Generator 6 13 ...
Page 223: ...Section 6 Schematics December2013 6 15 Wiring Diagram 3kW Hydraulic Generator 6 16 ...
Page 234: ...December2013 Section 6 Schematics 6 26 Hydraulic Schematic 2WD Models after SN 21396 6 25 ...
Page 238: ...December2013 Section 6 Schematics 6 30 Hydraulic Schematic 4WD Models after SN 21396 6 29 ...
Page 365: ...Section 6 Schematics December2013 6 157 Electrical Schematic S 60 HC CE 6 158 ...
Page 368: ...December2013 Section 6 Schematics 6 160 Chassis Wiring Diagram S 60 HC CE 6 159 ...
Page 373: ...Section 6 Schematics December2013 6 165 Platform Control Box Wiring Diagram S 60 HC CE 6 166 ...
Page 461: ......