3 - 64
S-60 • S-65 • S-60 TRAX • S-65 TRAX
Part No. 147753
S-60 HC • S-60X • S-60XC
December 2013
Section 3 • Scheduled Maintenance Procedures
1
Ford models:
Turn the valve on the LPG tank
clockwise to the off position (if equipped). Then
slowly disconnect the hose from the LPG tank.
2
Ford models:
Open the clamps from the LPG
tank straps and remove the LPG tank from the
machine (if equipped).
3 Open the ground controls side turntable cover
and locate the two hydraulic tank valves at the
hydraulic tank. Close the valves.
Component damage hazard. The
engine must not be started with the
hydraulic tank shut-off valves in
the closed position or component
damage will occur. If the tank
valves are closed, remove the key
from the key switch and tag the
machine to inform personnel of the
condition.
4 Place a suitable container underneath the
hydraulic tank.
5 Remove the drain plug from the hydraulic tank.
6 Completely drain the tank into a suitable
container. See capacity specifications.
E-1
Test or Replace the Hydraulic Oil
Genie requires that this procedure be performed
every 2000 hours or every two years, whichever
comes first. Perform this procedure more often if
dusty conditions exist.
Replacement or testing of the hydraulic oil is
essential for good machine performance and
service life. Dirty oil and suction strainers may
cause the machine to perform poorly and continued
use may cause component damage. Extremely
dirty conditions may require oil changes to be
performed more often.
Note: Before replacing the hydraulic oil, the oil may
be tested by an oil distributor for specific levels of
contamination to verify that changing the oil is
necessary.
If the hydraulic oil is not replaced at
the two year inspection, test the oil quarterly.
Replace the oil when it fails the test.
Note: When removing a hose assembly or fitting,
the O-ring (if equipped) on the fitting and/or the
hose end must be replaced. All connections must
be torqued to specification during installation.
Refer to Section 2,
Hydraulic Hose and Fitting
Torque Specifications
.
Note: Perform this procedure with the boom in the
stowed position.
Checklist E Procedures
open closed
Summary of Contents for S-60 HC
Page 1: ......
Page 215: ...Section 6 Schematics December2013 6 7 Ford DSG 423 Engine Wire Harness 6 8 ...
Page 218: ...December2013 Section 6 Schematics 6 10 Ford MSG 425 Engine Wire Harness 6 9 ...
Page 219: ...Section 6 Schematics December2013 6 11 Electrical Schematic Options All Models 6 12 ...
Page 222: ...December2013 Section 6 Schematics 6 14 Wiring Diagram Belt Driven Generator 6 13 ...
Page 223: ...Section 6 Schematics December2013 6 15 Wiring Diagram 3kW Hydraulic Generator 6 16 ...
Page 234: ...December2013 Section 6 Schematics 6 26 Hydraulic Schematic 2WD Models after SN 21396 6 25 ...
Page 238: ...December2013 Section 6 Schematics 6 30 Hydraulic Schematic 4WD Models after SN 21396 6 29 ...
Page 365: ...Section 6 Schematics December2013 6 157 Electrical Schematic S 60 HC CE 6 158 ...
Page 368: ...December2013 Section 6 Schematics 6 160 Chassis Wiring Diagram S 60 HC CE 6 159 ...
Page 373: ...Section 6 Schematics December2013 6 165 Platform Control Box Wiring Diagram S 60 HC CE 6 166 ...
Page 461: ......