Part No. 147753
S-60 • S-65 • S-60 TRAX • S-65 TRAX
3 - 5
S-60 HC • S-60X • S-60XC
December 2013
Section 3 • Scheduled Maintenance Procedures
Checklist A
Y N R
A-1 Manuals and decals
A-2 Pre-operation
inspection
A-3 Functions tests
A-4 Engine maintenance
A-5 Filter condition indicator
A-6 Oscillate axle
A-7 Inspect tracks,
S-60 TRAX and
S-65 TRAX
Perform after 40 hours:
A-8 30 day service
Perform every 30 days:
A-9 Check track tension,
S-60 TRAX and
S-65 TRAX
Perform every 100 hours:
A-10 Engine maintenance -
Ford and Perkins
models
A-11 Fuel filter/separator -
Diesel models
A-12 Check engine RPM-
Perkins models
A-13 Rotation bearing
Perform after 150 hours:
A-14 Drive hub oil
Perform every 200 hours:
A-15 Engine maintenance -
Ford models
A-16 Engine maintenance -
Perkins models
Checklist B
Y N R
B-1 Inspect battery
B-2 Inspect electrical
wiring
B-3 Exhaust system
B-4 Inspect air filter -
Ford, Deutz and
Perkins models
B-5 Oil cooler and fins-
Deutz models
B-6 Tires and wheels,
S-60, S-65, S-60 HC
S-60X and S-60XC
B-7 Brake configuration
B-8 Drive hub oil level
B-9 Engine RPM -
Ford and Deutz models
B-10 Ground control override
B-11 Directional valve
B-12 Platform leveling
B-13 Engine idle select
B-14 Fuel select -
Ford models
B-15 Drive brakes
B-16 Drive speed -
stowed position
B-17 Drive speed -
raised position
B-18 Alarm package
B-19 Hydraulic oil analysis
B-20 Fuel and hydraulic
tank cap venting
B-21 Fuel filter element -
Perkins models
B-22 Inspect the Boom
extend/retract cables
Maintenance Inspection Report
Instructions
• Make copies of this report to use for
each inspection.
• Select the appropriate checklist(s) for
the type of inspection to be
performed.
Daily or 8 hour
Inspection:
A
Quarterly or 250 hour
Inspection:
A+B
Semi-annual or 500 hour
Inspection:
A+B+C
Annual or 1000 hours
Inspection:
A+B+C+D
2 Year or 2000 hour
Inspection:
A+B+C+D+E
• Place a check in the appropriate box
after each inspection procedure is
completed.
• Use the step-by-step procedures in
this section to learn how to perform
these inspections.
• If any inspection receives an “N”, tag
and remove the machine from
service, repair and re-inspect it. After
repair, place a check in the “R” box.
Legend
Y = yes, acceptable
N = no, remove from service
R = repaired
Model
Serial number
Date
Hour meter
Machine owner
Inspected by (print)
Inspector signature
Inspector title
Inspector company
Comments
Summary of Contents for S-60 HC
Page 1: ......
Page 215: ...Section 6 Schematics December2013 6 7 Ford DSG 423 Engine Wire Harness 6 8 ...
Page 218: ...December2013 Section 6 Schematics 6 10 Ford MSG 425 Engine Wire Harness 6 9 ...
Page 219: ...Section 6 Schematics December2013 6 11 Electrical Schematic Options All Models 6 12 ...
Page 222: ...December2013 Section 6 Schematics 6 14 Wiring Diagram Belt Driven Generator 6 13 ...
Page 223: ...Section 6 Schematics December2013 6 15 Wiring Diagram 3kW Hydraulic Generator 6 16 ...
Page 234: ...December2013 Section 6 Schematics 6 26 Hydraulic Schematic 2WD Models after SN 21396 6 25 ...
Page 238: ...December2013 Section 6 Schematics 6 30 Hydraulic Schematic 4WD Models after SN 21396 6 29 ...
Page 365: ...Section 6 Schematics December2013 6 157 Electrical Schematic S 60 HC CE 6 158 ...
Page 368: ...December2013 Section 6 Schematics 6 160 Chassis Wiring Diagram S 60 HC CE 6 159 ...
Page 373: ...Section 6 Schematics December2013 6 165 Platform Control Box Wiring Diagram S 60 HC CE 6 166 ...
Page 461: ......