Part No. 147753
S-60 • S-65 • S-60 TRAX • S-65 TRAX
3 - 43
S-60 HC • S-60X • S-60XC
December 2013
Section 3 • Scheduled Maintenance Procedures
C-3
Test the Platform Overload
System (if equipped), S-60, S-65,
S-60 TRAX and S-65 TRAX
Genie specifications require that this procedure be
performed every 500 hours or six months,
whichever comes first.
Testing the platform overload system regularly is
essential to safe machine operation. Continued use
of an improperly operating platform overload
system could result in the system not sensing an
overloaded platform condition. Machine stability
could be compromised resulting in the machine
tipping over.
The platform overload system is designed to detect
an overloaded platform and prevent machine
operation anytime the machine is turned on. When
activated, the system halts all normal boom
operation, giving visual and audible warning to the
operator.
Models equipped with the platform overload option
are provided with additional machine components:
an adjustable spring-loaded platform support
subassembly, a limit switch, an electronic module
which receives the overload signal and interrupts
power, and an audio/visual warning indication to
alert the operator of the overload.
The platform support subassembly utilizes two load
support arms that are opposed in a full
parallelogram link. This isolates platform loads into
a shear or vertical state, which translates into a
compressive load. A spring in the parallelogram link
supports this purely compressive load regardless of
where the load is placed in the platform.
As weight is added to the platform, the spring will
compress until, when the platform is overloaded,
the lower arm contacts a limit switch and thereby
activating the overload signal. When adjusted
correctly, the platform overload system will
deactivate normal boom operation at platform
capacity.
Note: Perform this procedure with the boom fully
retracted and in the stowed position and with the
machine on a firm, level surface.
1 Remove all weight, tools and equipment from
the platform.
Note: Failure to remove all weight, tools and
accessories from the platform will result in an
inaccurate test.
2 Turn the key switch to ground control and pull
out the red Emergency Stop button to the on
position at both the ground and platform
controls. Start the engine from the ground
controls and level the platform. Do not turn the
engine off.
CHECKLIST
C
PROCEDURES
Summary of Contents for S-60 HC
Page 1: ......
Page 215: ...Section 6 Schematics December2013 6 7 Ford DSG 423 Engine Wire Harness 6 8 ...
Page 218: ...December2013 Section 6 Schematics 6 10 Ford MSG 425 Engine Wire Harness 6 9 ...
Page 219: ...Section 6 Schematics December2013 6 11 Electrical Schematic Options All Models 6 12 ...
Page 222: ...December2013 Section 6 Schematics 6 14 Wiring Diagram Belt Driven Generator 6 13 ...
Page 223: ...Section 6 Schematics December2013 6 15 Wiring Diagram 3kW Hydraulic Generator 6 16 ...
Page 234: ...December2013 Section 6 Schematics 6 26 Hydraulic Schematic 2WD Models after SN 21396 6 25 ...
Page 238: ...December2013 Section 6 Schematics 6 30 Hydraulic Schematic 4WD Models after SN 21396 6 29 ...
Page 365: ...Section 6 Schematics December2013 6 157 Electrical Schematic S 60 HC CE 6 158 ...
Page 368: ...December2013 Section 6 Schematics 6 160 Chassis Wiring Diagram S 60 HC CE 6 159 ...
Page 373: ...Section 6 Schematics December2013 6 165 Platform Control Box Wiring Diagram S 60 HC CE 6 166 ...
Page 461: ......