Part No. 147753
S-60 • S-65 • S-60 TRAX • S-65 TRAX
3 - 25
S-60 HC • S-60X • S-60XC
December 2013
Section 3 • Scheduled Maintenance Procedures
B-7
Confirm the Proper
Brake Configuration
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Proper brake configuration is essential to safe
operation and good machine performance.
Hydrostatic brakes and hydraulically-released,
spring-applied individual wheel brakes can appear
to operate normally when they are actually not fully
operational.
1 Locate the drive hub disconnect cap.
a
drive hub disconnect cap
2 Check each drive hub disconnect cap to be sure
it is in the engaged position.
B-8
Check the Drive Hub Oil Level
and Fastener Torque
Genie specifications require that this procedure be
performed every 250 hours or quarterly, whichever
comes first.
Failure to maintain proper drive hub oil levels may
cause the machine to perform poorly and continued
use may cause component damage.
S-60, S-65, S-60 HC, S-60X and S-60XC:
1 Drive the machine to rotate the hub until the
plugs are both horizontal.
a
drive hub plugs
2 Remove one plug and check the oil level.
Result: The oil level should be even with the
bottom of the plug hole.
3 If necessary, remove the other plug and add oil
until the oil level is even with the bottom of the
plug hole.
4 Install the plug(s) into the drive hub.
5 Check the torque of the drive hub mounting
bolts. Refer to Section 2,
Specifications
.
6 Repeat this procedure for each drive hub.
CHECKLIST
B
PROCEDURES
brake disengaged position
brake engaged position
a
a
Models with RT tires
Models with TRAX
Summary of Contents for S-60 HC
Page 1: ......
Page 215: ...Section 6 Schematics December2013 6 7 Ford DSG 423 Engine Wire Harness 6 8 ...
Page 218: ...December2013 Section 6 Schematics 6 10 Ford MSG 425 Engine Wire Harness 6 9 ...
Page 219: ...Section 6 Schematics December2013 6 11 Electrical Schematic Options All Models 6 12 ...
Page 222: ...December2013 Section 6 Schematics 6 14 Wiring Diagram Belt Driven Generator 6 13 ...
Page 223: ...Section 6 Schematics December2013 6 15 Wiring Diagram 3kW Hydraulic Generator 6 16 ...
Page 234: ...December2013 Section 6 Schematics 6 26 Hydraulic Schematic 2WD Models after SN 21396 6 25 ...
Page 238: ...December2013 Section 6 Schematics 6 30 Hydraulic Schematic 4WD Models after SN 21396 6 29 ...
Page 365: ...Section 6 Schematics December2013 6 157 Electrical Schematic S 60 HC CE 6 158 ...
Page 368: ...December2013 Section 6 Schematics 6 160 Chassis Wiring Diagram S 60 HC CE 6 159 ...
Page 373: ...Section 6 Schematics December2013 6 165 Platform Control Box Wiring Diagram S 60 HC CE 6 166 ...
Page 461: ......