73
9. Slide the coupler casing over the connection
and screw each coupler nut into each end of
the casing. Tighten the coupler nuts to
secure the connection.
10. Remove the dust cap from a 9-Tube Lead
not using the Extension. Slide the coupler
casing toward the unit to expose the lead
line coupler.
11. Remove the 9-hole gasket from the
remaining 9-Tube Assembly and align the
gasket with the coupler pins of the Lead.
12. Align the coupler pins of the Lead with the
appropriate
9-Tube Assembly coupler pins
and connect the assemblies.
NOTE:
LEAD “A” MUST BE ATTACHED TO
THE 9-TUBE ASSEMBLY ASSOCIATED WITH
THE SOFT SERVE FREEZER
. LEAD “B”
MUST BE ATTACHED THE 9-TUBE
ASSEMBLY ASSOCIATED WITH THE
FROZEN BEVERAGE FREEZER. THE
TOUCHSCREEN IS DESIGNED TO OPERATE
CERTAIN PUMPS ASSOCIATED WITH EACH
LEAD; MIXING THESE LEADS WITH THE
WRONG 9-TUBE ASSEMBLIES WILL RESULT
IN FLAVORS PUMPING TO THE WRONG
FREEZER.
13. Slide the coupler casing over the connection
and screw each coupler nut into each end of
the casing. Tighten the coupler nuts to
secure the connection.
14. If no Extension was used, repeat Steps 10-
13 to connect the other Lead and 9-Tube
Assembly.
Summary of Contents for TS 44SS/BEV
Page 7: ...6 General System Overview Figure 1 ...
Page 12: ...11 PAGE INTENTIONALLY LEFT BLANK ...
Page 13: ...12 Injector Assembly and Related Parts Figure 3 ...
Page 16: ...15 PAGE INTENTIONALLY LEFT BLANK ...
Page 17: ...16 Blending Assembly and Related Parts Figure 4 ...
Page 19: ...18 Syrup Pump and Related Parts Soft Serve Figure 5 ...
Page 21: ...20 Syrup Pump and Related Parts Frozen Beverage Figure 6 ...
Page 23: ...22 Sanitizer Pump and Related Parts Figure 7 ...
Page 27: ...26 Spare Parts Kit Soft Serve Figure 9 ...
Page 29: ...28 Spare Parts Kit Frozen Beverage Figure 10 ...
Page 30: ...29 PAGE INTENTIONALLY LEFT BLANK ...
Page 34: ...33 PAGE INTENTIONALLY LEFT BLANK ...