Liquiline System CA80HA
Commissioning
Hauser
55
‣
Wipe up any spilt reagent with a disposable tissue and rinse with clear water. Then dry the
cleaned areas with a cloth.
9.1
Preparatory steps
9.1.1
Commissioning steps
1. Connect the liquid-bearing hoses of the sample supply system.→ 58
2. Check that the hoses of the sample preparation system are mounted correctly in the
hose glands. It should not be possible to remove the hoses without the application of
force.
3. Visually inspect all the hose connections to ensure everything is correct. Use the hose
connection diagram→ 55.
4. Insert the bottles and make the most important menu settings.→ 59
9.1.2
Hose connection diagram
A0041298
56
Hose connection diagram
The diagrams below reflect the status at
the time of issue of this documentation.
The hose connection diagram that applies
for your device version is provided on the
inside of the door of the analyzer.
‣
Only connect the hoses as specified in
this diagram.
Summary of Contents for Liquiline System CA80HA
Page 2: ......
Page 214: ...www addresses endress com 71532810 71532810 ...