3
|
Components
Service manual
92
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
4
Measure contacts between the pins 1‑2 of the low pressure switch connector.
Result:
The switch MUST be closed.
5
Vacuum until pressurized just below operating pressure of the low pressure
switch.
6
Measure again contacts between the pins 1‑2 of the low pressure switch
connector.
Result:
The switch MUST be open.
INFORMATION
If the low pressure switch was triggered open, it will stay open until the refrigerant
pressure rises above the reset pressure of the low pressure switch.
7
Fill the refrigerant circuit with nitrogen until pressurized just below reset
pressure of the low pressure switch.
8
Measure again contacts between the pins 1‑2 of the low pressure switch
connector.
Result:
The switch MUST be open.
9
Fill the refrigerant circuit with nitrogen until pressurized just above reset
pressure of the low pressure switch.
10
Measure again contacts between the pins 1‑2 of the low pressure switch
connector.
Result:
The switch MUST be closed.
Low pressure switch connector
measurements are correct?
Then
Yes
Low pressure switch is OK. Return to
the troubleshooting of the specific error
and continue with the next procedure.
No
Replace the low pressure switch, see
3.8.2 Repair procedures
To remove the low pressure switch
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
Prerequisite:
Remove the required plate work, see
111].
Prerequisite:
Recuperate the refrigerant from the refrigerant circuit, see
142].
1
If needed, remove any parts to create more space for the removal of the low
pressure switch.
2
Remove the screws and remove the brackets and clip from the low pressure
switch and pipe.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...