3
|
Components
Service manual
122
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
3.13.2 Repair procedures
To remove the reactor
Prerequisite:
Stop the unit operation via the user interface.
Prerequisite:
Turn OFF the respective circuit breaker.
1
Remove the required plate work, see
111].
2
Remove the Faston connectors to disconnect the wires from the reactor.
3
Remove the 4 screws that fix the reactor to the switch box.
4
Remove the reactor.
a
a
b
c
c
c
c
a
Faston connector
b
Reactor
c
Screw
5
To install the reactor
1
Install the reactor on the correct location on the inverter mounting plate.
2
Install the 4 screws that fix the reactor to the inverter mounting plate.
3
Connect the 2 power rails to the reactor terminals using the 2 screws.
Is the problem solved?
Action
Yes
No further actions required.
No
Return to the troubleshooting of the
specific error and continue with the
next procedure.
3.14 Solenoid valve
3.14.1 Checking procedures
INFORMATION
It is recommended to perform the checks in the listed order.
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...