6
|
Technical data
Service manual
177
250D7Y1B
Sky Air Advance-series
ESIE19-13A – 2020.05
Use of the optional PCB KRP58M51 enables the use of an external time clock.
Same as with the automatic control, priority for capacity can be set. Priority for
capacity will be activated by changing field setting 2.01-02 in combination with the
closed contact on KRP58M51.
N°
Item
Display
Content
1
Capacity priority
setting
2.01
1
Off
2
On
The night time low noise operation will be overruled in the following conditions:
▪
Pump down residual operation
▪
Startup control
▪
Defrost operation
▪
Oil recovery
To control I-demand function
Set a limitation towards the power consumption of the system (e.g. budget control,
limit power consumption during peak moments, ...).
3 different demand settings can be selected by using terminal X801M:
▪
Demand 1: Close the contact between COM and contact 1 of the X801M
terminal.
▪
Demand 2: Close the contact between COM and contact 2 of the X801M
terminal.
▪
Demand 3: Close the contact between COM and contact 3 of the X801M
terminal.
ON
OFF
DS1
1 2 3 4
X81A
X80A
X800M
X801M
X801M
1
LNOP COM
2
3
1
LNOP COM
2
3
a
b
a
Power supply connector (on outdoor PCB X77A)
b
Transmission connector (on outdoor PCB X6A)
Specification
Value
Output on terminal X801M
▪
12 V DC
▪
12 mA
Maximum wire length
100 m
Demand 1
Power consumption limitation in function of setting on DS1.
ON
OFF
1 2 3 4
a
a
Shows the position of a switch
Summary of Contents for Sky Air Advance RZA200D7Y1B
Page 1: ...Service manual Sky Air Advance series RZA200D7Y1B RZA250D7Y1B ...
Page 190: ......
Page 191: ......
Page 192: ...ESIE19 13A 2020 05 Copyright 2020 Daikin Verantwortung für Energie und Umwelt ...